Presented by: Prefab House Nepal P. Ltd.www.prefabhousenepal.comE-mail : prefabhousenepal@gmail.com |
Building Solution in Nepal with Prefabricated Materials : Get your project done today . |
Prefab House Nepal P. Ltd
Our Major Service:
Prefab Home BUILDING, Prefab Office Building
Prefab School Building
Prefab Community Hospital and Warehosue System
Prefab House Nepal P. Ltd.
Detail Description
Prefab House Nepal Pvt. Ltd has exclusive design and engineering technology for prefab house, prefab school, community hospitals, warehouse which is made of the heavy metal structure and cement-board/UPVC Cladding as wall paneling and strength rolling channel outside on the wall with CGI sheet on the roof. The House has strong foundation on the ground with pillar as metal pipe and beam connected with nut-bolt system and pre foundation prefab block is installed in the beginning. It can be easily fabricated, customized and is a robust solution for shelter, teaching learning center development. It can be moved by a truck all of its part if required but it requires special heavy machines. Also, the house can be built as 2 floors. The useful life span is more than 25 years.
Our Vision
To become an nationally leading company that brings innovative solution in prefab building and meets customer expectations, providing high-quality products and services in the construction, landscape and prefab block, with our capabilities of utilization of advanced technology, technical human resource and application of engineering solutions.
Our Mission
To offer high-quality products and services in the construction of prefab school, home, hospitals, warehouse which complies with international standards within principals of social responsibility, business ethics and environmental awareness.
What we do?
We are specialized in designing, manufacturing and building high quality environmental friendly prefabricated house, steel structure warehouse, container house, mobile steel villa, sentry boxes, portable cabins, and portable toilets and so on.
Application of Prefab Building
- On-site accommodation, office, recreation room, etc.
2. Telecommunication’s room, Community Hospitals, Prefab School Building
3. Backyard granny flats
4. Holiday house
5. Other temporary project/hydropower/camp site construction
Special Features
- Low-cost, modular building design for easier assemble and disassemble
2. Cyclone proof and anti-seismic structure, heat insulation, water-proof, fire-resistant
3. To breaking the traditional concept in the design of portable house, it can be easy to move and delivery the whole house without any charge of disassembly thus it shall be greatly decrease the cost of the project .That‘s why the Prefab house Nepal portable house is very suitable for applied in the mobile and fixed construction site.Note: The container house layout and materials can be made as customer’ requirements.
Product appropriateness
- Customized;
Knock down system with lower transportation cost
3. Quick assemble and disassemble
4. Low cost
5. Reuse for several times.
6. It can be lifted up and movable
- Various choices, beautiful appearance
Our houses include high middle and low classes, can fit every kind of market. Compared with the old design the new design have no batter braces outsider and columns insider, it looks more clear and beautiful.
- Easy to assemble and relocated
Our new design just need simple tools to assemble.Each worker can assemble 30-40 square meters everyday.6 workers can finish 400 square meters prefab house in 2 days. It is especially suitable for emergency projects.
- High performance, long service time
The steel frame is very stable and durable, and with the EPS panels the house have good
Thermal insulation and noise control performance. The service time can be 20 years.
- Reused and environment protective
- The house can be recycle used for 20 times, and there will very litter damage caused when the house disassembled. The wall panels and roof panels and other components are manufactured in factory, so there is almost no building waste.
- Natural Disaster Proof
The whole structure include wall panels and roof panels is all together, so you don’t need to worry about the collapse in strong wind and strong earthquake. The house can proof 150Km/H wind and 8 Grade Earthquake.
- Low cost
Made by Steel structure and Sandwich Panel the price of the house will be very low in consideration of that the prefab house is easy to assemble, can be reused and relocated. It will save a lot for you.
Material Specification
Sizes: | 9’x9, 13’x13’,13’x18’,18’x39’, 40’ or customized |
Structure: Pillar Beam |
Heavy Metal 2”x2” with Nut-Bolt Joint structure |
Heavy Metal 2”x2” | |
Foundation | Base Cement+ Concrete +Sand 1:2:4 |
Wall: | Outside G.I Strength Inside Cement Board or Plywood or UPVC or Sandwich panels are EPS/PU/ROCK WOOL/MGO/Powder Coat Boarded. |
Thickness: | from 50mm to 100mm |
Roofing: | 0.38mm Corrugated Zinc Sheet (Color )/ Plain |
Flooring : | Cement Tile 1” thickness or Parquetting or Diamond plate or according to the requirement of customers |
Ceiling: | Cement Board or Plywood , UPVC EPS color steel sandwich panel |
Window: | aluminum alloy frame with glass/Nepal Board or PVC material |
Door: | Aluminum alloy frame door +Nepal Board, compound wooden door. |
Coloring | As Per Requirement |
Electrification | 2 light and standard electrical connection with 2 power socket at each room/As Per Requirement |
Sanitation | 1 Restroom with tile and basin and shower /As Per requirements |
Anti-seismic degree | 8 degree |
Design | Flat packing /Roofing/Customized Design |
Civil Construction | Estimate of Engineer for Site Cleaning ,Earthwork Excavation, Filling, Layout |
Features | Cyclone proof, anti-seismic structure, heat-insulation, water-proof, fire-resistant. |
Company Information
Name of Company: Prefab House Nepal P. Ltd.
Incorporation: Company Registrar Office, Nepal Government
VAT no: 603507373
Year of Registration: 2015
Tel: 01- 5151186, Cell: 9851187267
Contact Person: Keshav Pd. Timalsina, Dinesh Timalsina (9851187267)
Directors:
Dhankumari Timalsina – Proprietor
Keshav Pd. Timalsina – Chief Executive Officer
Dinesh Timalsina – Director /Engineer
Staff and Teams
Dinesh Timalsina – Technical Deployment Engineer
Mahima Pokhrel – Managing Director
Bhuwan Kandel-Team Deployer
Anil Pokhrel-Civil Engineer
Sworna Maharjan- Architect & Landscape Designer
Kamal Pokhrel-Mechanical Engineer
Bipin Ghimire-Structure Head
Santosh Acharya-Structure and Wall Cladding Supervisor
Deepa Timalsina- Accounting Officer
Anish Poudel – Business Developer
Lead Field WORK Supervisor
Bhola Ghimire- Chieft Technical Supervisor
Saroj Ghimire- Technical Supervisor
Dipendra Timalsina- Field Work Head
Kanchha Tamang- Civil Construction Worker
Govinda Shrestha – Logistic and Transport
Subin Awale-Filed Technician
Bijaya Lama- Field Technician
Sharmila- Machine and Dye Handler
Our Projects
Mahan Siddhartha School Building:
Complete project from Civil Excavation, Site Layout, Landscape Design and Compounding and Prefab Building of Classroom, Hostels and Toiletries included with Electrification and Sanitation System in the Premise
Jagatnarayan ASHRAM, Sankhamul, KATHMANDU
Truss system installation, prefab structure erection for Satsang Hall.
Satya Udhyan SCHOOL, Jorkhu, BUGMATI, LALITPUR
School Classroom Building, Landscape Design and Site layout Design, Civil Construction work of Returning Wall Block.
http://prefabhousenepal.com/index.php/2019/05/18/construction-company-in-nepal/
Prefab Guard Booth at US Embassy Residence
Jyamdi Kavrepalanchowk : Shree Bagh Bhairav Secondary School
Shree Ghyangfedi Secondary Schoool , Nuwakot
Some of the Concept for Project to Undertake.
School BUILDING PROPOSED CONCEPT
Cladding for Options
Contact Us;
info@prefabhousenepal.com
01-5571213 , 9851187267
skype: prefabhouseneapl
www.prefabhousenepal.com
This web publication and any files transmitted with it are intended solely for the use of the individual or entity to whom they are addressed. If you have received this page in error please notify the system manager. This message contains useful information and is intended only for the individual named.