Prefab House Nepal

prefab अतिआकर्षक तथा Modern घर, कार्यालय तथा अन्य व्यापारिक भवनहरुको निर्माण(construction)का लागि हामीलाई सम्पर्क गर्नुहोस्!

👉हाम्रा सेवाहरु –
✅Prefab & Truss Construction – Schools, Hospital, Resort, Nursing/Daycare home, Restaurant, Warehouse, Restroom, Parking Space, Offices, Rooftop, Homes, Meditation Center, Guard House, Parking Shed, आदिका लागि उपयुक्त

✅RCC Structure – Homes, Offices, Hotels, Residential Building, Corporate Houses, Business complex, आदिका लागि उपयुक्त

prefab #school #building #for #student #with 500 plus. Design of #two #story #prefb #school #building

काठमाण्डौ,भक्तपुर र ललितपुरका बिभिन्न क्षेत्रमा, दक्ष तथा अनुभवी सिभिल इन्जिनियर/आर्किटेक्टहरूको परामर्स
तथा नयाँ भवन निर्माण मापदण्ड र वाश्तुशाष्त्र अनुसार भूकम्प प्रतिरोधी घरको Design, 2D-3D नक्साङ्कन,Structural analysis/Drawing,Estimate,INTERIOR DESIGNING गर्नुपरेमा हामीलाई सम्झनुहोस् ।

हाम्रा सेवाहरु:
♦️निशुल्क निर्माण तथा वाश्तु परामर्ष
♦️आवाशीय,ब्यापारीक तथा संस्थागत भवनहरुको आकर्षक 2D/3D डिजाईनिङ
♦️Structural Analysis/Drawings
♦️घर,अफिस,तथा होटल,रेष्टुरेन्टको Modern Interior Decoration and Designing
♦️Quantity Estimation,Site Supervision and Quality Control

prefab #construction #building #house #ceiling #interior #decor#home #steel #structurally #earthquake #resistance

Contact us for further inquiry
nepalbusines977@gmail.com
+977- 9823376110
www.prefabhousenepal.com

Prefab House Nepal Pvt. Ltd ले एक ऊर्जा कुशल, लागत-अनुकूल र नेपाल को लागि उपयुक्त प्रिफेब घर, बिधालय लगायत अन्य मॉड्यूलर प्रकार को कोठा , Pavillion , Perogola , Shed ,Garage र आकर्षक इमारट को पनि निर्माण गर्न सक्छ । निर्माण मा प्रयोग गरिने प्रिफेब wall panel एक बलियो स्थायी पर्खाल प्रदान गर्दछ जुन गर्मीमा वा जाडोमा सहजै प्रयोग गर्न मिल्ने र यी भवनहरूले सबै मौसमको अवस्था र सबै उद्देश्यका लागि प्रयोगयोग्य छन् ।

एक अफिस, कार्यशाला, होटेल कोठा, अस्थायी project को बासस्थान को निर्माण मा जसलाई सुबिधा योग्य र चाडो प्रयोग गर्न मिल्ने होस् , त्यस्ता निर्माण कार्य हरु गर्न Prefab घरहरू एकदम सही विकल्प हो। स्थापना धेरै छिटो गर्न सकिन्छ छ किनकि निर्माणको लागि प्रयोग गरिएका सबै घटकहरू पहिल्यै कारखानामा तैयार भएका छन्। यी प्रप प्रक्रियाले हाम्रो कारखानामा लेआउट योजना डिजाइन गर्न र पूर्व स्थापना गर्न र तत्काल स्थापनाको लागी तैयार गर्दछ। छिटो स्थापना तपाईँको दैनिक व्यापारिक कार्यहरूमा कम अवरोध हो। किनकि त्यहाँ कुनै पनि साइट निर्माण छैन र भए पनि कम छ। यो क्षेत्रहरूमा विशेष रूपमा महत्त्वपूर्ण हुन सक्छ जहाँ तिब्र रुपमा कार्य सम्पन्न गर्नु आवश्यक छ । औसतमा तपाईले आफ्नो आदर्श कोठा निर्माण गर्न हाम्रो मोड्युलर डिजाइन प्रयोग गर्दा 80% समय बचत गर्न सक्नुहुन्छ।

हाम्रो मोड्युलर डिजाइनको प्रयोग गरेर अर्को लाभ भनेको पूर्वनिर्मित घर निर्माण गर्न खरिद गरिएको सबै सामग्री पुन: प्रयोग योग्य हुन्छ । यदि तपाईं आफ्नो भवनलाई सार्न आवश्यक छ भने केवल सबै घटकहरू असक्षम पार्नुहोस् र तिनीहरूलाई नयाँ स्थानमा लैजानुहोस्। सबै घटक पुन: प्रयोग मा आउछन्। यदि तपाइँलाई मूल लेआउट परिमार्जन गर्न आवश्यक छ भने हामीलाई सम्पर्क गर्नुहोस्। हामी कुनै पनि अतिरिक्त सामग्री आवश्यक भए तापनि लेआउट पुन: निर्देशित गर्नेछौं।
Contact us 🔜 prefabhousenepal@gmail.com
9851187267

prefab #house #in #Nepal #within #kathmandu #Construction #project #in #nepal #house #school #resort #ecopanel #cementboard #drywall #false #ceiling

Contact us today at prefabhousenepal@gmail.com

सम्पर्क-
9851187267 ,prefabhousenepal@gmail.com

House Construction Process In Nepal and Costing


Ref. No:
Master Plan Design and Drawing
Name of Project :- Preparation of Master Plan ,Drawing, Design , Structure Design , Exterior Modeling of Building blocks
Project Summary
SN. Particular Amount Result/ Deliverables
1 Site Survey with Total Station , Surveyor & Assistant team with logistics of team to Dhading (Site Field Visit & Inspection) 32,000.00 Surveyed Map (1:100 Scale)
2 Detailed Concept Planning of Building Block with Placement , Design and Development of Concept in Drawing (2D Autocad) for Real Construction Work by Concept Planner Expert team ( Construction Team , Engineer, Architect) Master Plan Drawing with Beautiful Project placing all blocks in right position and land suitable design and structures with Engineering Safety and Space utilize focused
3 Detailed layout and plan of Septic Tank , Soak Pit ,Water Filter 25,000.00 Drain and Water Filter Placement Layout, Plumbing, Soak Pit Layout Map
4 Master Plan Drawing & Design of Building block ,1 Sport Ground , 1 Vegetable Garden , Solar Panel for Hot Water & Energy for Light , Water Filter System ,2 Ropani Land 75,200.00 Master Plan Including all Blocks in A1 Size Paper
5 Architectural Drawing of 6 Bedrooms Hostel Building (20 sq. m number 6) 38,736.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
6 Architectural Drawing of 1 Dinning Hall 20sq.m 9,684.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
7 Architectural Drawing of Reading Hall 40 Sqm. 19,368.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
8 Architectural Drawing of Meeting Hall 20 sq. m 7,532.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
9 1 Warden Family House Drawing 50 Sqm. 17,216.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
10 2 common bathrooms plus common toilet and hand washing facilities for 35 girls 14,526.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
11 Structural Column Plan , Layout , Truss Details , of All Building Blocks 190,500.00 structural column plan , truss details ,section x-x of Each Block in (A-2 Size), Working Drawing of Building Blocks in A-2
12 Foundation Footing Details & Working Drawing of All Building Blocks 45000.00 Footing Details and Working Drawing of Building in (A-2 ) Size Paper
13 Exterior Model of Building , Landscaping model & Exterior Visualization and Walk through of Complete project Not Required During meeting discussion suggested not required.
14 Bill of Quantity Preparation For Building Blocks 27,000.00 BOQ with Cost For Construction &Material Specification of Structure,Roofing,Wall,Door/Window in details
15 Structure Analysis Report of the Hostel Building >1000 Sqft. 32,550.00 structural report with data analysis and structure recommendations)
16 Electrical & Lighting Placement Drawing 32000.00 Light , Power Socket Drawing in A-2 Size
17 Solar System Installation Modelling and Plan with Details Drawings 30,000.00 Solar Panel Installation Drawing and System Supply Connection Drawing
Subtotal 5961312.00
Total With VAT 13% & 77520.56
Total 673882.56
Note :- Phase #1
Arch. Architectural
COST ESTIMATE FOR Quality Assurance
COST ESTIMATE FOR Quality Assurance
HIRING CONSULTING FIRMS TO CONDUCT FOR Quality Monitoring & Technical Reporting’s During Construction Work and Verifying Work Execution of Prefab Hostel Building with other Necessary Block Project.
S.N Description Person Unit Hr. Rate Total Remark
A Salary of Personnel
2 Architectural Engineer with Construction Supervision 1 14 7500 105,000.00
3 Civil Engineer with Supervision 1 5 5500 27,500.00 .
4 Technical /Structure Engineer Supervision 1 4 16500 66,000.00
Tank, Soak pit, Plumbing , Landscape Supervision 1 5 3500 17,500.00
5 Interior Design, Furniture, Kitchen Designer, Hall Design Consultant 1 5 21500 107500.00
6 ,Electrical Engineer , Sanitary & Waste Manage Expert 1 5 21500 107500.00
A Sub Total 431,000.00
B Miscellaneous expenses
Communication cost 7000.00
Drafting/ reports 20000.00
Equipment’s, vehicles, computers , Software , Analysis 20000.00
Sub Total 47000.00
Grand Total 478000.00
VAT @13% of G 62140.00
Total (G+H) 540,140.00
Building design process
Content
1. Site Survey- Map, Photo, Trace map , Google Map
2. The Concept Plan of the overall project by design team
3. Establishing the need & Requirements with eco-friendly focus.
4. Feasibility Study & Site Survey for the Given Requirement of Building
5. Selection of designers , Structural Engineers as per the job schedules,
6. Drawing and Detailing of Concept design & Planner in AutoCAD and other Software
7. Detailed design –Architectural ,Structural Drawing
8. Production information of Landscape, Ground, Boundary, Building, Draining, Water, Plumbing Works for Construction on-site.
9. Building Model & Structural Design & development with Walk Through
10. Bill of Quantity & Material Specification –
11. Final Cost Estimate Preparation for Construction of Project as per drawing & Design.
12. BID Documents Preparation( If Required)
13. Conclusion ;Find out more & Better Improve
Building’s Construction process
Note: Final Costing and BOQ will be after Preparation of Detailed Project Report( Master Plan, Architectural Drawing , Structural Drawing , Opening Schedules, Foundation Details )
1. Make Booklet Copy with All detailed drawings, master plan, photos.
2. Bid Documents and Get EOI -Comparison
3. Select the Expert and Competitive Firm for Project Execution.
4. Establishing the Scope of Work with the specified Cost for given Work.
5. MoU between Clients and Contractors
6. Start off Project Work with Civil Works,
7. Followed by Foundation, Structure, Wall, Roofing, False Ceiling, Doors/Window Installation / Electrical and Plumbing Works.
8. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
9. Painting and Finishing Work of Building
10. Production of Futsal, Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site.
11. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
12. Project Summary Reporting and Handover –
13. Find out more & Better Improve
Quality Assurance Process
1. Site Visit and Verify the construction work as per all detailed drawings, master plan, model and photos.
2. Prepare Report and Recommend Contractor for the Work Punch list.
3. Measure, plan and guide for water tank, drain, electrical wiring works.
4. Verifying the Scope of Work and make Clarity between Client and Contractor by the Report of Civil Engineer for given Work.
5. MoU between Clients and Contractors
6. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
7. Assure Building Safety, Usability and Functionality
8. Guide Worker for Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site by Engineer/ Team Leader.
9. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
10. Project Summary Reporting and Handover –
11. Find out more & Better Improve
Abstract of Cost
Project: Estimate cost of Hostel Building and Prefab Building Block at Dhading , Nepal
Type of work: Construction of Prefab Building Block for Hostel with
Complete works including Boundary wall
Date: January 14 2020
S.n Description of work L, m W,m H,m Area (Sqm. /cum.)
Total Price Deliverables
I Construction of Prefab 6 Bedrooms for 35 Girls Each 20 Sqm.) 1 15.700 7.65 2.75 120 4200071.85 6 Rooms with Door/Window, Light Non-Furnished )
II Construction of Prefab Dinning Hall 1 6 3.25 2.75 20 891735 Hall Room Unfurnished
III Construction of Prefab Kitchen Hall 1 6 3.25 2.75 20 723879 Kitchen with modular Cabinets & Counter Top
IV Construction of Prefab Hall for Reading /TV/ 1 10 4.00 2.75 40 1398800 Hall Room with Unfurnished
V Construction of Prefab Meeting Hall 1 8 3.25 2.75 26 965172 Meeting Hall Unfurnished
VI Construction of Prefab Warden Family House 1 12 4.00 2.75 48 1781856 Family House with Non Furnished
VII Construction of Prefab Common toilet/bathrooms 1 8 3.25 2.75 26 1077076 Toilets with Commode, Tiles, Shower, tap
VIII Construction of Soak pit for Waste and Drain manage 4 2 2.00 1.5 24
cu.m 925000
IX Construction of Water Tank 1 4 2.00 2 12 cu.m 1680000
Sub-total (A) NPR 13,643,589.85
1.2 Installation of Green Solar Plant for Energy Source 2 KW 1 3.00 4.00 NPR 725,300.00 2 Kw solar and 5 lights & System
1.3 Futsal Playground of Size 40 feet x70 fet 1 40.00 10.00 NPR 925,320.00 Futsal Playground
1.4 Compound Work with Metal Pipe & CGI Fencing ( For 2 Ropani Land 1 190 m NPR 1,533,300.00 Metal Fencing with CGI Sheet Cover
1.5 Installation of Water Filter System 1
NPR 455,500.00 Water Filter of 200 liter.
1.6 Installation of Pavement in Ground for 2 Ropani Land (Assumed) 1 100 Sqm NPR 1,150,000.00 Hexagon Pavement in Ground
1.7 Installation of Water Heating Solar for Hot Water Supply 200 l NPR 325,000.00 200l water heating
1.8 Installation of Solar System for Cooking
3 KW( Instead of Bio-Gas) 1 NPR 1,125,000.00 Solar System for Cooking
1.9
Sub-total(B) NPR 6,239,420.00
Total(A+B) NPR 19,883,009.00
VAT 13% NPR 2,584,791.28
Scope of Work Grand Total NPR 22,467,801.13
1 Structure Metal , Prefab Wall , Doors/Window , Roofing False Ceiling ,Painting with turn-key solution
2 25-30 % Advance during MOU
3
Submitted by:
Checked by:
Approved by:
Project Timeline
Address: Dhading
Project :
Starting Date: March First Week
Completion Date:
Project Duration: 5 Months
S.N Works Duration (weeks) Time Period (Week)
3-Mar 25-Mar 5
Apr. 2
May 20
May 2-Jun 25-Jun 2-July 3-
Aug
1 30% Design and Layout 3
2 Site Visit and Custom Fabrication of structure for Project 4
Material for structure and core part delivery 2
3 Structural Metal Frame Installation 3
4 45% Roof Truss and Covering 2
5 Gutter and Flooring PCC 1
6 Ceiling 2
7 Wall Panel installation 3
8 25% Wall Framing Window and Door 2
9 Ground Pavement & Boundary 3
10 Electrification 2
11 Coloring 2
Total Duration : Approx. 5 months including Building Works, Boundary Wall , Ground Pavement
Ref. No:
Master Plan Design and Drawing
Name of Project :- Preparation of Master Plan ,Drawing, Design , Structure Design , Exterior Modeling of Building blocks
Project Summary
SN. Particular Amount Result/ Deliverables
1 Site Survey with Total Station , Surveyor & Assistant team with logistics of team to Dhading (Site Field Visit & Inspection) 32,000.00 Surveyed Map (1:100 Scale)
2 Detailed Concept Planning of Building Block with Placement , Design and Development of Concept in Drawing (2D Autocad) for Real Construction Work by Concept Planner Expert team ( Construction Team , Engineer, Architect) Master Plan Drawing with Beautiful Project placing all blocks in right position and land suitable design and structures with Engineering Safety and Space utilize focused
3 Detailed layout and plan of Septic Tank , Soak Pit ,Water Filter 25,000.00 Drain and Water Filter Placement Layout, Plumbing, Soak Pit Layout Map
4 Master Plan Drawing & Design of Building block ,1 Sport Ground , 1 Vegetable Garden , Solar Panel for Hot Water & Energy for Light , Water Filter System ,2 Ropani Land 75,200.00 Master Plan Including all Blocks in A1 Size Paper
5 Architectural Drawing of 6 Bedrooms Hostel Building (20 sq. m number 6) 38,736.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
6 Architectural Drawing of 1 Dinning Hall 20sq.m 9,684.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
7 Architectural Drawing of Reading Hall 40 Sqm. 19,368.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
8 Architectural Drawing of Meeting Hall 20 sq. m 7,532.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
9 1 Warden Family House Drawing 50 Sqm. 17,216.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
10 2 common bathrooms plus common toilet and hand washing facilities for 35 girls 14,526.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
11 Structural Column Plan , Layout , Truss Details , of All Building Blocks 190,500.00 structural column plan , truss details ,section x-x of Each Block in (A-2 Size), Working Drawing of Building Blocks in A-2
12 Foundation Footing Details & Working Drawing of All Building Blocks 45000.00 Footing Details and Working Drawing of Building in (A-2 ) Size Paper
13 Exterior Model of Building , Landscaping model & Exterior Visualization and Walk through of Complete project Not Required During meeting discussion suggested not required.
14 Bill of Quantity Preparation For Building Blocks 27,000.00 BOQ with Cost For Construction &Material Specification of Structure,Roofing,Wall,Door/Window in details
15 Structure Analysis Report of the Hostel Building >1000 Sqft. 32,550.00 structural report with data analysis and structure recommendations)
16 Electrical & Lighting Placement Drawing 32000.00 Light , Power Socket Drawing in A-2 Size
17 Solar System Installation Modelling and Plan with Details Drawings 30,000.00 Solar Panel Installation Drawing and System Supply Connection Drawing
Subtotal 5961312.00
Total With VAT 13% & 77520.56
Total 673882.56
Note :- Phase #1
Arch. Architectural
COST ESTIMATE FOR Quality Assurance
COST ESTIMATE FOR Quality Assurance
HIRING CONSULTING FIRMS TO CONDUCT FOR Quality Monitoring & Technical Reporting’s During Construction Work and Verifying Work Execution of Prefab Hostel Building with other Necessary Block Project.
S.N Description Person Unit Hr. Rate Total Remark
A Salary of Personnel
2 Architectural Engineer with Construction Supervision 1 14 7500 105,000.00
3 Civil Engineer with Supervision 1 5 5500 27,500.00 .
4 Technical /Structure Engineer Supervision 1 4 16500 66,000.00
Tank, Soak pit, Plumbing , Landscape Supervision 1 5 3500 17,500.00
5 Interior Design, Furniture, Kitchen Designer, Hall Design Consultant 1 5 21500 107500.00
6 ,Electrical Engineer , Sanitary & Waste Manage Expert 1 5 21500 107500.00
A Sub Total 431,000.00
B Miscellaneous expenses
Communication cost 7000.00
Drafting/ reports 20000.00
Equipment’s, vehicles, computers , Software , Analysis 20000.00
Sub Total 47000.00
Grand Total 478000.00
VAT @13% of G 62140.00
Total (G+H) 540,140.00
Building design process
Content
1. Site Survey- Map, Photo, Trace map , Google Map
2. The Concept Plan of the overall project by design team
3. Establishing the need & Requirements with eco-friendly focus.
4. Feasibility Study & Site Survey for the Given Requirement of Building
5. Selection of designers , Structural Engineers as per the job schedules,
6. Drawing and Detailing of Concept design & Planner in AutoCAD and other Software
7. Detailed design –Architectural ,Structural Drawing
8. Production information of Landscape, Ground, Boundary, Building, Draining, Water, Plumbing Works for Construction on-site.
9. Building Model & Structural Design & development with Walk Through
10. Bill of Quantity & Material Specification –
11. Final Cost Estimate Preparation for Construction of Project as per drawing & Design.
12. BID Documents Preparation( If Required)
13. Conclusion ;Find out more & Better Improve
Building’s Construction process
Note: Final Costing and BOQ will be after Preparation of Detailed Project Report( Master Plan, Architectural Drawing , Structural Drawing , Opening Schedules, Foundation Details )
1. Make Booklet Copy with All detailed drawings, master plan, photos.
2. Bid Documents and Get EOI -Comparison
3. Select the Expert and Competitive Firm for Project Execution.
4. Establishing the Scope of Work with the specified Cost for given Work.
5. MoU between Clients and Contractors
6. Start off Project Work with Civil Works,
7. Followed by Foundation, Structure, Wall, Roofing, False Ceiling, Doors/Window Installation / Electrical and Plumbing Works.
8. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
9. Painting and Finishing Work of Building
10. Production of Futsal, Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site.
11. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
12. Project Summary Reporting and Handover –
13. Find out more & Better Improve
Quality Assurance Process
1. Site Visit and Verify the construction work as per all detailed drawings, master plan, model and photos.
2. Prepare Report and Recommend Contractor for the Work Punch list.
3. Measure, plan and guide for water tank, drain, electrical wiring works.
4. Verifying the Scope of Work and make Clarity between Client and Contractor by the Report of Civil Engineer for given Work.
5. MoU between Clients and Contractors
6. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
7. Assure Building Safety, Usability and Functionality
8. Guide Worker for Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site by Engineer/ Team Leader.
9. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
10. Project Summary Reporting and Handover –
11. Find out more & Better Improve
Abstract of Cost
Project: Estimate cost of Hostel Building and Prefab Building Block at Dhading , Nepal
Type of work: Construction of Prefab Building Block for Hostel with
Complete works including Boundary wall
Date: January 14 2020
S.n Description of work L, m W,m H,m Area (Sqm. /cum.)
Total Price Deliverables
I Construction of Prefab 6 Bedrooms for 35 Girls Each 20 Sqm.) 1 15.700 7.65 2.75 120 4200071.85 6 Rooms with Door/Window, Light Non-Furnished )
II Construction of Prefab Dinning Hall 1 6 3.25 2.75 20 891735 Hall Room Unfurnished
III Construction of Prefab Kitchen Hall 1 6 3.25 2.75 20 723879 Kitchen with modular Cabinets & Counter Top
IV Construction of Prefab Hall for Reading /TV/ 1 10 4.00 2.75 40 1398800 Hall Room with Unfurnished
V Construction of Prefab Meeting Hall 1 8 3.25 2.75 26 965172 Meeting Hall Unfurnished
VI Construction of Prefab Warden Family House 1 12 4.00 2.75 48 1781856 Family House with Non Furnished
VII Construction of Prefab Common toilet/bathrooms 1 8 3.25 2.75 26 1077076 Toilets with Commode, Tiles, Shower, tap
VIII Construction of Soak pit for Waste and Drain manage 4 2 2.00 1.5 24
cu.m 925000
IX Construction of Water Tank 1 4 2.00 2 12 cu.m 1680000
Sub-total (A) NPR 13,643,589.85
1.2 Installation of Green Solar Plant for Energy Source 2 KW 1 3.00 4.00 NPR 725,300.00 2 Kw solar and 5 lights & System
1.3 Futsal Playground of Size 40 feet x70 fet 1 40.00 10.00 NPR 925,320.00 Futsal Playground
1.4 Compound Work with Metal Pipe & CGI Fencing ( For 2 Ropani Land 1 190 m NPR 1,533,300.00 Metal Fencing with CGI Sheet Cover
1.5 Installation of Water Filter System 1
NPR 455,500.00 Water Filter of 200 liter.
1.6 Installation of Pavement in Ground for 2 Ropani Land (Assumed) 1 100 Sqm NPR 1,150,000.00 Hexagon Pavement in Ground
1.7 Installation of Water Heating Solar for Hot Water Supply 200 l NPR 325,000.00 200l water heating
1.8 Installation of Solar System for Cooking
3 KW( Instead of Bio-Gas) 1 NPR 1,125,000.00 Solar System for Cooking
1.9
Sub-total(B) NPR 6,239,420.00
Total(A+B) NPR 19,883,009.00
VAT 13% NPR 2,584,791.28
Scope of Work Grand Total NPR 22,467,801.13
1 Structure Metal , Prefab Wall , Doors/Window , Roofing False Ceiling ,Painting with turn-key solution
2 25-30 % Advance during MOU
3
Submitted by:
Checked by:
Approved by:
Project Timeline
Address: Dhading
Project :
Starting Date: March First Week
Completion Date:
Project Duration: 5 Months
S.N Works Duration (weeks) Time Period (Week)
3-Mar 25-Mar 5
Apr. 2
May 20
May 2-Jun 25-Jun 2-July 3-
Aug
1 30% Design and Layout 3
2 Site Visit and Custom Fabrication of structure for Project 4
Material for structure and core part delivery 2
3 Structural Metal Frame Installation 3
4 45% Roof Truss and Covering 2
5 Gutter and Flooring PCC 1
6 Ceiling 2
7 Wall Panel installation 3
8 25% Wall Framing Window and Door 2
9 Ground Pavement & Boundary 3
10 Electrification 2
11 Coloring 2
Total Duration : Approx. 5 months including Building Works, Boundary Wall , Ground Pavement
Ref. No:
Master Plan Design and Drawing
Name of Project :- Preparation of Master Plan ,Drawing, Design , Structure Design , Exterior Modeling of Building blocks
Project Summary
SN. Particular Amount Result/ Deliverables
1 Site Survey with Total Station , Surveyor & Assistant team with logistics of team to Dhading (Site Field Visit & Inspection) 32,000.00 Surveyed Map (1:100 Scale)
2 Detailed Concept Planning of Building Block with Placement , Design and Development of Concept in Drawing (2D Autocad) for Real Construction Work by Concept Planner Expert team ( Construction Team , Engineer, Architect) Master Plan Drawing with Beautiful Project placing all blocks in right position and land suitable design and structures with Engineering Safety and Space utilize focused
3 Detailed layout and plan of Septic Tank , Soak Pit ,Water Filter 25,000.00 Drain and Water Filter Placement Layout, Plumbing, Soak Pit Layout Map
4 Master Plan Drawing & Design of Building block ,1 Sport Ground , 1 Vegetable Garden , Solar Panel for Hot Water & Energy for Light , Water Filter System ,2 Ropani Land 75,200.00 Master Plan Including all Blocks in A1 Size Paper
5 Architectural Drawing of 6 Bedrooms Hostel Building (20 sq. m number 6) 38,736.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
6 Architectural Drawing of 1 Dinning Hall 20sq.m 9,684.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
7 Architectural Drawing of Reading Hall 40 Sqm. 19,368.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
8 Architectural Drawing of Meeting Hall 20 sq. m 7,532.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
9 1 Warden Family House Drawing 50 Sqm. 17,216.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
10 2 common bathrooms plus common toilet and hand washing facilities for 35 girls 14,526.00 Arch. Drawing with Elevation , top ,plan view in (A-2 Size)
11 Structural Column Plan , Layout , Truss Details , of All Building Blocks 190,500.00 structural column plan , truss details ,section x-x of Each Block in (A-2 Size), Working Drawing of Building Blocks in A-2
12 Foundation Footing Details & Working Drawing of All Building Blocks 45000.00 Footing Details and Working Drawing of Building in (A-2 ) Size Paper
13 Exterior Model of Building , Landscaping model & Exterior Visualization and Walk through of Complete project Not Required During meeting discussion suggested not required.
14 Bill of Quantity Preparation For Building Blocks 27,000.00 BOQ with Cost For Construction &Material Specification of Structure,Roofing,Wall,Door/Window in details
15 Structure Analysis Report of the Hostel Building >1000 Sqft. 32,550.00 structural report with data analysis and structure recommendations)
16 Electrical & Lighting Placement Drawing 32000.00 Light , Power Socket Drawing in A-2 Size
17 Solar System Installation Modelling and Plan with Details Drawings 30,000.00 Solar Panel Installation Drawing and System Supply Connection Drawing
Subtotal 5961312.00
Total With VAT 13% & 77520.56
Total 673882.56
Note :- Phase #1
Arch. Architectural
COST ESTIMATE FOR Quality Assurance
COST ESTIMATE FOR Quality Assurance
HIRING CONSULTING FIRMS TO CONDUCT FOR Quality Monitoring & Technical Reporting’s During Construction Work and Verifying Work Execution of Prefab Hostel Building with other Necessary Block Project.
S.N Description Person Unit Hr. Rate Total Remark
A Salary of Personnel
2 Architectural Engineer with Construction Supervision 1 14 7500 105,000.00
3 Civil Engineer with Supervision 1 5 5500 27,500.00 .
4 Technical /Structure Engineer Supervision 1 4 16500 66,000.00
Tank, Soak pit, Plumbing , Landscape Supervision 1 5 3500 17,500.00
5 Interior Design, Furniture, Kitchen Designer, Hall Design Consultant 1 5 21500 107500.00
6 ,Electrical Engineer , Sanitary & Waste Manage Expert 1 5 21500 107500.00
A Sub Total 431,000.00
B Miscellaneous expenses
Communication cost 7000.00
Drafting/ reports 20000.00
Equipment’s, vehicles, computers , Software , Analysis 20000.00
Sub Total 47000.00
Grand Total 478000.00
VAT @13% of G 62140.00
Total (G+H) 540,140.00
Building design process
Content
1. Site Survey- Map, Photo, Trace map , Google Map
2. The Concept Plan of the overall project by design team
3. Establishing the need & Requirements with eco-friendly focus.
4. Feasibility Study & Site Survey for the Given Requirement of Building
5. Selection of designers , Structural Engineers as per the job schedules,
6. Drawing and Detailing of Concept design & Planner in AutoCAD and other Software
7. Detailed design –Architectural ,Structural Drawing
8. Production information of Landscape, Ground, Boundary, Building, Draining, Water, Plumbing Works for Construction on-site.
9. Building Model & Structural Design & development with Walk Through
10. Bill of Quantity & Material Specification –
11. Final Cost Estimate Preparation for Construction of Project as per drawing & Design.
12. BID Documents Preparation( If Required)
13. Conclusion ;Find out more & Better Improve
Building’s Construction process
Note: Final Costing and BOQ will be after Preparation of Detailed Project Report( Master Plan, Architectural Drawing , Structural Drawing , Opening Schedules, Foundation Details )
1. Make Booklet Copy with All detailed drawings, master plan, photos.
2. Bid Documents and Get EOI -Comparison
3. Select the Expert and Competitive Firm for Project Execution.
4. Establishing the Scope of Work with the specified Cost for given Work.
5. MoU between Clients and Contractors
6. Start off Project Work with Civil Works,
7. Followed by Foundation, Structure, Wall, Roofing, False Ceiling, Doors/Window Installation / Electrical and Plumbing Works.
8. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
9. Painting and Finishing Work of Building
10. Production of Futsal, Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site.
11. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
12. Project Summary Reporting and Handover –
13. Find out more & Better Improve
Quality Assurance Process
1. Site Visit and Verify the construction work as per all detailed drawings, master plan, model and photos.
2. Prepare Report and Recommend Contractor for the Work Punch list.
3. Measure, plan and guide for water tank, drain, electrical wiring works.
4. Verifying the Scope of Work and make Clarity between Client and Contractor by the Report of Civil Engineer for given Work.
5. MoU between Clients and Contractors
6. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
7. Assure Building Safety, Usability and Functionality
8. Guide Worker for Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site by Engineer/ Team Leader.
9. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
10. Project Summary Reporting and Handover –
11. Find out more & Better Improve
Abstract of Cost
Project: Estimate cost of Hostel Building and Prefab Building Block at Dhading , Nepal
Type of work: Construction of Prefab Building Block for Hostel with
Complete works including Boundary wall
Date: January 14 2020
S.n Description of work L, m W,m H,m Area (Sqm. /cum.)
Total Price Deliverables
I Construction of Prefab 6 Bedrooms for 35 Girls Each 20 Sqm.) 1 15.700 7.65 2.75 120 4200071.85 6 Rooms with Door/Window, Light Non-Furnished )
II Construction of Prefab Dinning Hall 1 6 3.25 2.75 20 891735 Hall Room Unfurnished
III Construction of Prefab Kitchen Hall 1 6 3.25 2.75 20 723879 Kitchen with modular Cabinets & Counter Top
IV Construction of Prefab Hall for Reading /TV/ 1 10 4.00 2.75 40 1398800 Hall Room with Unfurnished
V Construction of Prefab Meeting Hall 1 8 3.25 2.75 26 965172 Meeting Hall Unfurnished
VI Construction of Prefab Warden Family House 1 12 4.00 2.75 48 1781856 Family House with Non Furnished
VII Construction of Prefab Common toilet/bathrooms 1 8 3.25 2.75 26 1077076 Toilets with Commode, Tiles, Shower, tap
VIII Construction of Soak pit for Waste and Drain manage 4 2 2.00 1.5 24
cu.m 925000
IX Construction of Water Tank 1 4 2.00 2 12 cu.m 1680000
Sub-total (A) NPR 13,643,589.85
1.2 Installation of Green Solar Plant for Energy Source 2 KW 1 3.00 4.00 NPR 725,300.00 2 Kw solar and 5 lights & System
1.3 Futsal Playground of Size 40 feet x70 fet 1 40.00 10.00 NPR 925,320.00 Futsal Playground
1.4 Compound Work with Metal Pipe & CGI Fencing ( For 2 Ropani Land 1 190 m NPR 1,533,300.00 Metal Fencing with CGI Sheet Cover
1.5 Installation of Water Filter System 1
NPR 455,500.00 Water Filter of 200 liter.
1.6 Installation of Pavement in Ground for 2 Ropani Land (Assumed) 1 100 Sqm NPR 1,150,000.00 Hexagon Pavement in Ground
1.7 Installation of Water Heating Solar for Hot Water Supply 200 l NPR 325,000.00 200l water heating
1.8 Installation of Solar System for Cooking
3 KW( Instead of Bio-Gas) 1 NPR 1,125,000.00 Solar System for Cooking
1.9
Sub-total(B) NPR 6,239,420.00
Total(A+B) NPR 19,883,009.00
VAT 13% NPR 2,584,791.28
Scope of Work Grand Total NPR 22,467,801.13
1 Structure Metal , Prefab Wall , Doors/Window , Roofing False Ceiling ,Painting with turn-key solution
2 25-30 % Advance during MOU
3
Submitted by:
Checked by:
Approved by:
Project Timeline
Address: Dhading
Project :
Starting Date: March First Week
Completion Date:
Project Duration: 5 Months
S.N Works Duration (weeks) Time Period (Week)
3-Mar 25-Mar 5
Apr. 2
May 20
May 2-Jun 25-Jun 2-July 3-
Aug
1 30% Design and Layout 3
2 Site Visit and Custom Fabrication of structure for Project 4
Material for structure and core part delivery 2
3 Structural Metal Frame Installation 3
4 45% Roof Truss and Covering 2
5 Gutter and Flooring PCC 1
6 Ceiling 2
7 Wall Panel installation 3
8 25% Wall Framing Window and Door 2
9 Ground Pavement & Boundary 3
10 Electrification 2
11 Coloring 2
Total Duration : Approx. 5 months including Building Works, Boundary Wall , Ground Pavement

Prefab House

Prefab House Nepal .com
Modular house
1, Easy install and dismantle
2, longevity and recyclable
3, light steel stucture frame
4, water and fire-proofing
5, warm-keep
Feature:
Modular K type house is a modular house which width and length can be extended by adding number of 1820mm unit.
The heat insulated material can be EPS or other sandwich panel.
All the components are standard and prefabricated with the advantage of assembling and disassembling easily.
Eight skilled workers can finish 100m2 in 8 hours.
One 40HQ container can load about 250m2 house body materials.
Waterproof design of steel structure, heat insulation material ensures the house to resist heavy wind load of 0.45KN/m2 and 7 degree seismic intensity.
All the components are standard and prefabricated with the advantage of assembling and disassembling easily.
The life span of the house is 15 years.
House applications
Used for temporary office, dormitory, classrooms, meeting room, warehouse, shops etc. In construction industry, government purchase for residence, military housing and other purpose
Low cost, durable structure, convenient relocation, easy to assemble and disassemble, environment-protection, etc.
Structure is reliable: Light steel structure system is safe and reliable, satisfied modern architecture concept.
Easy assembly and disassembly: The house can be assembled and disassembled many times, used repeatedly. It just need simple tools to assemble. Each worker can assemble 20-30square meters every day. 6 worker can finish 300sqm prefab house in 2 days.
Beautiful decoration: The prefab house is beautiful and grace, have bright and bland color, flat and neat board, with good decoration effect.
Flexible layout: Door and window can be assembled in any position, partition wall panel can be assemble in any transverse axes sites. Stair is assembled in outside.
Using life: All the light steel structures have antisepsis-spraying treatment. The normal using age are above 15 years.
Environmental protection and economy: Prefab house design is reasonable, easy to assemble and disassemble, used circularly, low wastage, without building rubbish. Average using cost is less than other kinds of building annually.

No. Classify Name Technical Parameter
1 Size Length NK+160(n=4,5,6…) K is modular(1K=1820mm)
2 Width 2K≤Width≤6K, K is modular(1K=1820mm)
3 Wall Height single floor height less than 6K
4 Roof Slope 1:10, 1:5
5 Interior Net Height ≥2780mm(not include false ceiling size)
6 Floor ≤3 floors
7 Standard Ground Beam C80# profiled steel
8 Post  double C80# profiled steel
9 Roof Beam Herringbone Trussed Beam (jointing by C80# profiled steel)
10 Roof Purlin 40# angle iron
11 Wall Panel 50, 75mm thickness double color steel sandwich panel
12 Roof Panel 50, 75, 100mm thickness double color steel sandwich panel
13 Exterior Door Steel frame sandwich panel door,szie:820mm*2000mm
14 Interior Door Sandwichpanel door,size:750*2000mm
15 Window PVC sliding window,size:1740mm*925mm
16 Floor 15mm thickness plywood
17 Options Flase Ceiling mineral wool acoustic panel,aluminium buckle panel
18 Window PVC casement window,PVC top hung window,aluminium sliding window,aluminium alloy casement window,blind window
19 Door Single opening security door,size:900mm*2100mm;
double opening security door,size:1740mm*2100mm;compound wooden door
20 Interior Electrical supply plan,design and construction
21 Water Plumbing & Sanitary supply plan,design and construction
22 Floor 15mm bamboo panel,building templet board
23 Floor Decoration Material Ceramic tiles,PVC floor, compound wooden floor
24 Frame Roof Dead Load 30kg/Sqm
25 Roof Live Load 50kg/Sqm
26 Floor Dead Load 50kg/Sqm
27 Floor Live Load 200kg/Sqm
28 Wind Resistance 11 degree (105km/h)
29 Fireproof Degree Maintenance wall panel is nonflammable material,B1 degree;
Floor plywood could reach B1 degree after making fireproof process.
30 Earthquake resistant intensity 7degree

 
Related Searches:
Prefab House Wooden House Modular Container House Modular Prefabricated House Metal Prefab House Steel Structure House Prefabricated House trade Prefab House trade
Send your inquiry directly to this supplier
 

Prefab Modular Buildingand in Nepal & Its Overview

MODULAR BUILDINGS in Nepal

 Modular buildings are sectional prefabricated buildings that are manufactured in a plant, and delivered to the customer in one or more complete modular sections. Modular buildings are considerably different from mobile homes.
Modular buildings have a wide variety of uses. They will either be used for long-term temporary or permanent facilities. Such uses include construction camps, schools and classrooms, civilian and military housing needs, and industrial facilities. Modular buildings are a perfect solution in remote and rural areas where conventional construction may not be reasonable or even possible.
Continue reading “Prefab Modular Buildingand in Nepal & Its Overview”

Prefab House Nepal -Company Profile

Presented by: Prefab House Nepal P. Ltd.

www.prefabhousenepal.com

E-mail : prefabhousenepal@gmail.com

 
Building Solution in Nepal with Prefabricated Materials : Get your project done today .

Prefab House Nepal P. Ltd

Our Major Service:

Prefab Home BUILDING, Prefab Office Building

Prefab School Building

Prefab Community Hospital and Warehosue System


Prefab House Nepal P. Ltd.

Detail Description

Prefab House Nepal Pvt. Ltd has exclusive design and engineering technology for prefab house, prefab school, community hospitals, warehouse which is made of the heavy metal structure and cement-board/UPVC Cladding as wall paneling and strength rolling channel outside on the wall with CGI sheet on the roof. The House has strong foundation on the ground with pillar as metal pipe and beam connected with nut-bolt system and pre foundation prefab block is installed in the beginning. It can be easily fabricated, customized and is a robust solution for shelter, teaching learning center development. It can be moved by a truck all of its part if required but it requires special heavy machines. Also, the house can be built as 2 floors. The useful life span is more than 25 years.

Our Vision

To become an nationally leading company that brings innovative solution in prefab building and meets customer expectations, providing high-quality products and services in the construction, landscape and prefab block, with our capabilities of utilization of advanced technology, technical human resource  and application of engineering solutions.

Our Mission

To offer high-quality products and services in the construction of prefab school, home, hospitals, warehouse which complies with international standards within principals of social responsibility, business ethics and environmental awareness.

What we do?

We are specialized in designing, manufacturing and building high quality environmental friendly prefabricated house, steel structure warehouse, container house, mobile steel villa, sentry boxes, portable cabins, and portable toilets and so on.
 

Application of Prefab Building

  1. On-site accommodation, office, recreation room, etc.
    2.  Telecommunication’s room, Community Hospitals, Prefab School Building
    3.  Backyard granny flats
    4.  Holiday house
    5.  Other temporary project/hydropower/camp site construction

Special Features

  1. Low-cost, modular building design for easier assemble and disassemble
    2. Cyclone proof and anti-seismic structure, heat insulation, water-proof, fire-resistant
    3. To breaking the traditional concept in the design of portable house, it can be easy to move and delivery the whole house without any charge of disassembly thus it shall be greatly decrease the cost of the project .That‘s why the Prefab house Nepal  portable house is very suitable for applied in the mobile and fixed construction site.Note: The container house layout and materials can be made as customer’ requirements.

 

Product appropriateness

  1. Customized;
    Knock down system with lower transportation cost
    3. Quick assemble and disassemble
    4. Low cost
    5. Reuse for several times.
    6. It can be lifted up and movable

 
 

  1. Various choices, beautiful appearance

Our houses include high middle and low classes, can fit every kind of market. Compared with the old design the new design have no batter braces outsider and columns insider, it looks more clear and beautiful.

  1. Easy to assemble and relocated

Our new design just need simple tools to assemble.Each worker can assemble 30-40 square meters everyday.6 workers can finish 400 square meters prefab house in 2 days. It is especially suitable for emergency projects.

  1. High performance, long service time

The steel frame is very stable and durable, and with the EPS panels the house have good
Thermal insulation and noise control performance. The service time can be 20 years.

  1. Reused and environment protective
  2. The house can be recycle used for 20 times, and there will very litter damage caused when the house disassembled. The wall panels and roof panels and other components are manufactured in factory, so there is almost no building waste.
  3. Natural Disaster Proof

The whole structure include wall panels and roof panels is all together, so you don’t need to worry about the collapse in strong wind and strong earthquake. The house can proof 150Km/H wind and 8 Grade Earthquake.

  1. Low cost

Made by Steel structure and Sandwich Panel the price of the house will be very low in consideration of that the prefab house is easy to assemble, can be reused and relocated. It will save a lot for you.
 
 

Material Specification

Sizes: 9’x9, 13’x13’,13’x18’,18’x39’, 40’ or customized
Structure:   Pillar
Beam
Heavy Metal 2”x2”  with Nut-Bolt Joint structure
Heavy Metal 2”x2”
Foundation Base Cement+ Concrete +Sand 1:2:4
Wall: Outside G.I Strength
Inside Cement Board or Plywood or UPVC or
Sandwich panels are EPS/PU/ROCK WOOL/MGO/Powder Coat Boarded.
Thickness: from 50mm to 100mm
Roofing: 0.38mm Corrugated Zinc Sheet (Color )/ Plain
Flooring : Cement Tile  1” thickness or Parquetting or
Diamond plate or according to the requirement of customers
Ceiling: Cement Board or
Plywood , UPVC
EPS color steel sandwich panel
Window: aluminum alloy frame with glass/Nepal Board or PVC material
Door: Aluminum alloy frame door +Nepal Board, compound wooden door.
Coloring As Per Requirement
Electrification 2 light and standard electrical connection with 2 power socket at each room/As Per Requirement
Sanitation 1 Restroom with tile and basin and shower /As Per requirements
Anti-seismic degree 8 degree
Design Flat packing /Roofing/Customized Design
Civil Construction  Estimate of Engineer for Site Cleaning ,Earthwork Excavation, Filling, Layout
Features Cyclone proof, anti-seismic structure, heat-insulation, water-proof, fire-resistant.

 

Company Information

Name of Company: Prefab House Nepal P. Ltd.
Incorporation: Company Registrar Office, Nepal Government
VAT no: 603507373
Year of Registration: 2015
Tel: 01- 5151186, Cell: 9851187267
Contact Person: Keshav Pd. Timalsina,  Dinesh Timalsina (9851187267)
 
 
 

Directors:

Dhankumari Timalsina – Proprietor
Keshav Pd. Timalsina – Chief Executive Officer
Dinesh Timalsina – Director /Engineer

Staff and Teams

Dinesh Timalsina – Technical Deployment Engineer
Mahima Pokhrel  –   Managing Director
Bhuwan Kandel-Team Deployer
Anil Pokhrel-Civil Engineer
Sworna Maharjan- Architect & Landscape Designer
Kamal Pokhrel-Mechanical Engineer
Bipin Ghimire-Structure Head
Santosh Acharya-Structure and Wall Cladding Supervisor
Deepa Timalsina- Accounting Officer
Anish Poudel – Business Developer
 
 

Lead Field WORK Supervisor

Bhola Ghimire- Chieft Technical Supervisor
Saroj Ghimire- Technical Supervisor
Dipendra Timalsina- Field Work Head
Kanchha Tamang- Civil Construction Worker
Govinda Shrestha – Logistic and Transport
Subin Awale-Filed Technician
Bijaya Lama- Field Technician
Sharmila- Machine and Dye Handler
 
 
 

Our Projects

 

Mahan Siddhartha School Building:

Complete project from Civil Excavation, Site Layout, Landscape Design and Compounding and Prefab Building of Classroom, Hostels and Toiletries included with Electrification and Sanitation System in the Premise
 
prefab school and building in Nepal (11)
 

Jagatnarayan ASHRAM, Sankhamul, KATHMANDU

Truss system installation, prefab structure erection for Satsang Hall.
 
prefab school and building in Nepal (10)
 

Satya Udhyan SCHOOL, Jorkhu, BUGMATI, LALITPUR

 
School Classroom Building, Landscape Design and Site layout Design, Civil Construction work of Returning Wall Block.
 
prefab school and building in Nepal (118)http://prefabhousenepal.com/index.php/2019/05/18/construction-company-in-nepal/

Prefab Guard Booth at US Embassy Residence

EXTERIOR VIEW
FLOOR AND CEILING

Jyamdi Kavrepalanchowk : Shree Bagh Bhairav Secondary School

 
prefab school and building in Nepal (82)
 

Shree Ghyangfedi Secondary Schoool , Nuwakot

 
prefab school and building in Nepal (9)
 

Some of the Concept for Project to Undertake.

 
 
 
AutoSave_school model 2
 

School BUILDING PROPOSED CONCEPT

 
 
 
 
 
 

Cladding for Options

4_Copy3
 
 
 
 
 
 
 
 
 
 
 
 

Contact Us;

info@prefabhousenepal.com
01-5571213 , 9851187267

skype: prefabhouseneapl

www.prefabhousenepal.com

 
 
This web publication and any files transmitted with it are  intended solely for the use of the individual or entity to whom they are addressed. If you have received this page in error please notify the system manager. This message contains useful  information and is intended only for the individual named.